How do I invoice a client, including progress billing and retainage?

D
Written by David Campos

An invoice in Stasora bills against a signed contract: you draft it, a named person in your company approves it, and only then can it be emailed, printed or paid. Simple invoices come with the Field plan; progress billing by schedule of values, with retainage, comes with the Office plan.

Before you start

  • A signed contract. A project with no signed contract has nothing to invoice yet. The project says so.

  • The right plan. Invoicing and payments are on Field and Office. Schedules of values and retainage are on Office.

Draft and send an invoice

  1. Open the project and start a new invoice.

  2. Choose what to bill: one or more payment milestones from the signed contract, client-signed time and materials (T&M) tickets, or an amount, or a percentage of the contract.

  3. Draft it. Drafting writes one invoice with a line for each item you picked. Nothing is emailed and nothing is charged.

  4. Check each line before approving. The invoice shows where each line comes from.

  5. A named person in your company approves the invoice.

  6. Open the approved invoice. It shows on your letterhead, ready to send.

  7. Press Email to client, check the address, and press Send email. The confirm box shows who it goes to before anything is sent. Or press Print and hand it over yourself.

  8. To collect online, use the Collect payment step. See "Getting paid through Stripe."

Nothing leaves draft on its own. An invoice is never sent because it was approved, or on a timer. A person presses send.

Each item bills once

A payment milestone or a signed T&M ticket can be billed once. If another draft billed it first, from this device or another, nothing is written and the list refreshes to show what is still open.

Milestones that would bill past the contract's value are refused, and nothing is written.

Progress billing with a schedule of values (Office)

A schedule of values breaks the contract into the pieces the work happens in, such as demolition, framing and electrical. Each piece has a scheduled value.

  1. Open the project, then Schedule of values.

  2. Add a line for each piece of work, with its scheduled value.

  3. Set the contract's retainage rate. You can override the rate on a single line.

  4. As work moves, record how far along each line is, as a percentage.

  5. Draft this period's application for payment. It bills the work completed since the last application, less retainage.

  6. A named person approves the application.

If nothing moved since the last application, there is nothing to bill this period, and Stasora says so. A draft application can be discarded; an approved one is a record and cannot be deleted.

A job bills one way. A contract already billed by payment milestones, or by T&M tickets on their own invoices, cannot start a schedule of values, because the same work would be billed twice.

Retainage

Retainage is the part of each progress payment held back.

  • Stasora works out retainage line by line and adds it up.

  • Each application shows how much is withheld to date.

  • On the invoice, retainage appears as a withholding ("Less retainage held to date"), not as a charge.

  • A retainage rate above 20% is refused as a likely typo. Enter the rate your contract states.

  • If you raise the rate partway through a job, Stasora does not take extra out of an application your client already has. The difference is withheld from the draws still to come.

Release retainage

  1. On the schedule of values, choose the line and the amount to release.

  2. The release is pending. Stasora drafts an application for payment to bill it, or adds it to the next one if an application is already waiting.

  3. A named person approves that application. Only then does the release move on the line.

You can release only what is actually being withheld on an approved application. Stasora refuses a larger amount and tells you the most you can release.

Need help?

Stasora does not give legal, accounting or tax advice, and does not tell you what to charge. Retainage rules and lien deadlines vary by state and by contract; check with your attorney or accountant.

For help with the product, write to [email protected].